- Provided a new Electrical Service in each unit.
- Installation of provided fixture package.
- Complete demolition and reinstallation of electrical wiring in the existing structures.
After sustaining tornado damage, our client’s site sat vacant for years. Due to severe weather damage, the complex required demolition down to the framing structure before we could safely implement electrical solutions.
The InPwr Inc. installation included new energy star-certified lighting fixtures, electrical distribution gear, and convenience power. Other cost-saving measures included new electrical service in each unit. We also provided innovative installation methods to save time and help accelerate the schedule.